Town Projects
Town Center Wastewater System
Project Description

Vernon Township/Sussex County Municipal Utilities Authority
Wastewater Treatment
Project Description

The Project comprises those facilities required to convey wastewater from Vernon Township to the SCMUA Upper Wallkill Treatment Plant, provide a new 265,000 gpd capacity allocation to Vernon Township for its Town Center, treat said wastewater, and return 265,0000 gpd of treated effluent to Vernon Township for aquifer recharge. The Project consists of the following major components:

• Acquisition of United Water Vernon Sewage Transmission Corp. (VSTC) Pumping Station #3, and renovation/expansion thereof, to allow the pumping station to convey the additional volume of wastewater from Vernon Township to SCMUA's treatment plant.

• Construction of a fourteen (14") inch diameter wastewater force main along Route 94, beginning in the vicinity of the United Water VSTC Pumping Station #3, and terminating at a connection point with SCMUA's Hamburg Bypass Force Main, thereby allowing wastewater from Vernon to discharge directly to the Upper Wallkill treatment plant.

• Construction of new treatment units and modification of existing units and infrastructure at the Upper Wallkill treatment plant to allow the flow received from Vernon to be treated at said plant, completely segregated from non-domestic sources of wastewater (including landfill leachate), with 265,000 gpd to be treated to a level which will meet the requirements of Class IIA groundwater quality standards, with the specific effluent limits listed below:

Ammonia-Nitrogen (NH3-N) <0.5 mg/l
Total Nitrogen <10 mg/l
Fecal Coliform <200 coli per 100 ml

• Construction of a new treated water pumping station at the Upper Wallkill treatment plant site, for return of treated water to Vernon Township for groundwater recharge.

• Acquisition of, cleaning, disinfection, and renovations to the existing United Water VSTC lower force main, for future interconnection with other SCMUA infrastructure to allow said force main to be utilized to convey said 265,000 gpd of treated water to the aquifer recharge site within Vernon Township.

• Leasing of a parcel, from Vernon Township, known as the Herold Square site, for use as the site for groundwater recharge of treated water, and construction of recharge beds and control facilities on said site.

 